School Roof Replacement


School roof replacement planned around the school calendar.

Roof deck covered in synthetic underlayment with wrapped chimney chase, staged metal trim and mountain view

What school roof replacement involves


We plan the work for summer break or other closures, aiming to have the building closed up before students come back.

A school roof is a big low-slope area over a building full of kids most of the year. The calendar drives everything.

Low-slope roof stripped in patches, dark sheet torn away exposing OSB decking, satellite dish and tear-off shovel
Newly sheathed OSB roof deck marked with chalk lines beside an older gravel roof with scrap lumber

What matters on school roof replacement


Planning around the building

Government buildings stay in use while the roof is worked on. The plan covers where we get onto the roof, where material is staged and how the entrances stay clear, before anything comes off.

A record of the work

Public buildings need a file of what was done. We photograph each stage and record the materials used, so the next person responsible for that roof knows what is up there.

House under construction with flat roofs covered in synthetic underlayment, metal panels stacked, scaffolding and mountains behind

Schools and the calendar


Most school roof work has to happen while the building is empty, which in Utah means summer. That is a short window, so the walk-through, the planning and the material ordering start well before school lets out.

Schools also carry a lot of rooftop equipment and drains. Those details are where school roofs leak, so they get the most attention during the replacement.

Service areaSalt Lake City & surrounding counties
Covering9 counties
In the trade27 years
As Hancock Signature8 years

How the system goes together


Bringing an old metal roof back

A metal roof with sound panels and a tired finish is usually a candidate for restoration rather than replacement. Every exposed screw gets pulled and replaced one size up with a fresh washer, the seams and penetrations get reinforced, and then a coating system goes over the whole assembly to seal the thousands of small fastener points at once.

It only works on sound steel

Where the panel has rusted through, or where water has been getting into the insulation below for years, there is nothing for a coating to hold onto and we will say so.

Coatings on a low-slope roof

A roof coating is a maintenance system, not a replacement. On a sound membrane or a metal roof with good fasteners, a properly prepped coating adds reflectivity and buys real years. Over a wet insulation layer or a membrane that has already delaminated, it is paint over a problem.

Prep is the whole job

Cleaning, seam treatment, and fixing what is actually broken take longer than rolling the coating on.

When coating is wrong

If a roof is done, coating it just delays the same conversation.

What we check

  • Field condition and granule loss
  • Valleys, ridges and every transition
  • Penetrations and their flashing
  • Gutter and fascia condition

How we approach it


1

Look first

We get on the roof and read what is actually happening before quoting anything.

2

Say what we find

Photographs and a plain explanation, including when the answer is that you do not need us yet.

3

Built in sequence

Crews we hire and run, working the right detail in the right order.

4

Leave it clean

Magnet over the yard, container gone, walked with you.

Bands off the lake

Homes on the north end of the valley catch snow bands that come off the water and dump on a narrow strip while the next town over gets nothing. That snow arrives wet and it arrives fast. A roof in one of those corridors takes more events per winter than the numbers for the metro would suggest.

It is a per-street question

Two miles can be the difference between an average snow year and a hard one. Which is why a roof age that seems fine on paper sometimes is not.

We ask about the last few winters

Homeowners in a band know they are in one.

The wet spring snow problem

Late season storms carry more water per inch than anything that falls midwinter. That heavy stuff clings to a roof instead of sliding, pushes on gutters, and refreezes at night into a solid mass on the overhang. It is also the load most likely to find a framing weakness.

After a heavy spring storm

Walk the drip line and look for bent gutter hangers and separated seams. Then look at the ceilings inside along exterior walls.

What we check on the deck

Spongy sheathing between rafters, especially over the eave where the ice sat.

Bare OSB roof decking with chalk lines, exposed rafters at left, house and wood fence behind

What this looks like on a real roof


There is a version of school roof replacement that gets sold off a clipboard in the driveway and a version that comes off actually reading the roof. The second one costs the same and lasts.

What follows is the part most people never get told: what usually went wrong before we arrived, and what the job looks like when it is done in the right order.

Where roofs go wrong


The shortcut we see most

Rooftop units and drains added over the years, with the roof patched around them instead of reworked. Those patches are where most public-building leaks start.

What good looks like instead

Every penetration, curb and drain flashed into the roof system properly, and a record of it in the facility file.

Signs worth a look

  • Water still standing days after a storm
  • Ceiling-tile stains near rooftop units
  • Seams lifting at the edges and parapets
  • The same area repaired more than once

What to expect


1

Before the job starts

A walk of the whole roof, photographs of what we found, and a plain written scope. We talk through access, staging and the building’s schedule before any work is planned.

2

While the work is underway

The building stays in use. Material is staged where it is out of the way, entrances stay clear, and the loudest work is planned around the schedule we are given.

3

When it is done

Photographs of each stage and a record of the materials installed, ready for the facility file.

Related work


Government covers more than one job, and they are not interchangeable. These are the others in the same family, each on its own page.

Full roof replacement on government buildings, planned around the building’s schedule.
Repairs on government roofs, traced to where the water actually gets in.
Commercial roof systems for government facilities, specified for the building.
Roofing for city halls, public works buildings and other municipal facilities.
Full roof replacement on municipal buildings, sequenced so the building stays in use.
Roof replacement on county buildings, from courthouses to road shops.
Roof replacement on state facilities, planned around fixed work windows.
Roof replacement on federal buildings, with the documentation and site conduct the work calls for.
Roof repair for libraries, rec centers and other public buildings.
Emergency roof repair on government buildings: the water gets stopped first.
Storm and hail damage on government roofs, documented and repaired.
Metal roofing on government and public buildings.
TPO membrane on government flat roofs.
EPDM membrane roofing on government buildings.
Flat and low-slope roofing on government buildings.
Roof coatings that add years to sound government roofs.
Waterproofing for government roofs, decks and parapets.
Roof inspections for government facilities, with photographs and a written record.
Scheduled roof maintenance for government buildings.
Roof restoration for government roofs with years left in them.

Questions we get asked


Not the question you had? Call the shop and ask a person. We would rather talk it through than have you guess from a website.

(801) 382-8898
Can you work while the building is in use?

Usually. We plan access, staging and the loudest work around the building’s schedule before the job starts.

Do you document the work?

Yes. Each stage is photographed and the materials are recorded, so the facility has a file of what was installed.

Can you look at several of our buildings?

Yes. We can inspect them all and give you a list in order of need, so the budget goes to the roof closest to failing.

Do you handle the insurance side?

On hail-damaged roofs, we work with your insurance to get the roof covered. We document the damage thoroughly with photographs, so the claim reflects what is actually on the roof.

Do you work through the winter?

Yes, with judgment. Shingles need to seal, and in genuine cold that takes longer or needs hand sealing. Emergency work happens whenever it has to. Full replacements get scheduled around the weather rather than forced into it.

How do I know when a roof is getting close?

Granules collecting in the gutters, tabs lifting or curling at the edges, shingles that look bare in patches, and daylight or staining in the attic. Any of those is worth a look.

Ask about school roof replacement


Call (801) 382-8898 or send a note. We will look at the roof and tell you straight what it needs.