Skip to content

Government Roof Inspections


Roof inspections for government facilities, with photographs and a written record.

Roof deck covered in synthetic underlayment with wrapped chimney chase, staged metal trim and mountain view

What government roof inspections involves


We walk the whole roof, check the membrane, seams, drains, units and edges, and give you photographs and a plain written summary.

A facility manager needs to know which roof needs money first. An inspection that only lists problems does not help with that.

Low-slope roof stripped in patches, dark sheet torn away exposing OSB decking, satellite dish and tear-off shovel
Newly sheathed OSB roof deck marked with chalk lines beside an older gravel roof with scrap lumber

What matters on government roof inspections


Planning around the building

Government buildings stay in use while the roof is worked on. The plan covers where we get onto the roof, where material is staged and how the entrances stay clear, before anything comes off.

A record of the work

Public buildings need a file of what was done. We photograph each stage and record the materials used, so the next person responsible for that roof knows what is up there.

Roof deck covered with blue-printed Sharkskin underlayment, gray parapet walls, wooded hills and cloudy sky beyond

What you get


Every inspection comes back with photographs of what we found, including the parts that are fine, and a plain list of what needs attention now and what can wait.

For an agency with several buildings, we can inspect all of them and rank them by need, so the budget goes where it does the most good.

Service areaSalt Lake City & surrounding counties
Covering9 counties
In the trade27 years
As Hancock Signature8 years

How the system goes together


Flat roofs and the membrane choice

Low-slope roofs do not shed, they hold. TPO is a heat-welded white sheet that reflects a lot of the summer load. EPDM is a black rubber sheet that handles cold and movement well. PVC costs more and handles grease and chemicals, which is why it ends up over restaurant kitchens. Modified bitumen comes in rolls torched or adhered in layers, and built-up is the old tar-and-gravel assembly still sitting on plenty of buildings here.

Drainage beats material

Whichever sheet goes down, if the water does not get to a drain within a couple of days, the roof is going to fail early.

Coatings on a low-slope roof

A roof coating is a maintenance system, not a replacement. On a sound membrane or a metal roof with good fasteners, a properly prepped coating adds reflectivity and buys real years. Over a wet insulation layer or a membrane that has already delaminated, it is paint over a problem.

Prep is the whole job

Cleaning, seam treatment, and fixing what is actually broken take longer than rolling the coating on.

When coating is wrong

If a roof is done, coating it just delays the same conversation.

What we check

  • Field condition and granule loss
  • Valleys, ridges and every transition
  • Penetrations and their flashing
  • Gutter and fascia condition

How we approach it


1

Look first

We get on the roof and read what is actually happening before quoting anything.

2

Say what we find

Photographs and a plain explanation, including when the answer is that you do not need us yet.

3

Built in sequence

Crews we hire and run, working the right detail in the right order.

4

Leave it clean

Magnet over the yard, container gone, walked with you.

Two seasons of roof weather

Roofs here really only get two conditions and both are hard. There is the cold half, where everything is about snow load, ice at the eave and condensation under the deck. Then there is the hot dry half, where ultraviolet and surface heat cook the asphalt and the only water that arrives comes fast and sideways. Systems that do fine in a mild climate get worn from both ends up here.

Building for both

The details that handle winter and the details that handle summer are different details, and a roof has to carry both sets.

Hail does not always look like damage

Hail here can be pea sized and harmless or big enough to bruise a mat. A bruise is a soft spot where the granules are knocked loose and the fiberglass underneath is fractured. You cannot see it from the ground, and from a ladder you often have to feel for it with a thumb.

Soft metal tells the truth

Before we call a roof hit, we check the soft metals: vents, gutter aprons, the fins on a swamp cooler. Dents there are the honest record of what fell.

Roof deck covered with blue synthetic underlayment, staged shingle bundle, drip edge, and worker in hi-vis kneeling at eave

What this looks like on a real roof


There is a version of government roof inspections that gets sold off a clipboard in the driveway and a version that comes off actually reading the roof. The second one costs the same and lasts.

What follows is the part most people never get told: what usually went wrong before we arrived, and what the job looks like when it is done in the right order.

Where roofs go wrong


The shortcut we see most

Rooftop units and drains added over the years, with the roof patched around them instead of reworked. Those patches are where most public-building leaks start.

What good looks like instead

Every penetration, curb and drain flashed into the roof system properly, and a record of it in the facility file.

Signs worth a look

  • Water still standing days after a storm
  • Ceiling-tile stains near rooftop units
  • Seams lifting at the edges and parapets
  • The same area repaired more than once

What to expect


1

Before the job starts

A walk of the whole roof, photographs of what we found, and a plain written scope. We talk through access, staging and the building’s schedule before any work is planned.

2

While the work is underway

The building stays in use. Material is staged where it is out of the way, entrances stay clear, and the loudest work is planned around the schedule we are given.

3

When it is done

Photographs of each stage and a record of the materials installed, ready for the facility file.

Related work


Government covers more than one job, and they are not interchangeable. These are the others in the same family, each on its own page.

Full roof replacement on government buildings, planned around the building’s schedule.
Repairs on government roofs, traced to where the water actually gets in.
Commercial roof systems for government facilities, specified for the building.
Roofing for city halls, public works buildings and other municipal facilities.
Full roof replacement on municipal buildings, sequenced so the building stays in use.
Roof replacement on county buildings, from courthouses to road shops.
Roof replacement on state facilities, planned around fixed work windows.
Roof replacement on federal buildings, with the documentation and site conduct the work calls for.
School roof replacement planned around the school calendar.
Roof repair for libraries, rec centers and other public buildings.
Emergency roof repair on government buildings: the water gets stopped first.
Storm and hail damage on government roofs, documented and repaired.
Metal roofing on government and public buildings.
TPO membrane on government flat roofs.
EPDM membrane roofing on government buildings.
Flat and low-slope roofing on government buildings.
Roof coatings that add years to sound government roofs.
Waterproofing for government roofs, decks and parapets.
Scheduled roof maintenance for government buildings.
Roof restoration for government roofs with years left in them.

Questions we get asked


Not the question you had? Call the shop and ask a person. We would rather talk it through than have you guess from a website.

(801) 382-8898
Can you work while the building is in use?

Usually. We plan access, staging and the loudest work around the building’s schedule before the job starts.

Do you document the work?

Yes. Each stage is photographed and the materials are recorded, so the facility has a file of what was installed.

Can you look at several of our buildings?

Yes. We can inspect them all and give you a list in order of need, so the budget goes to the roof closest to failing.

Do you work through the winter?

Yes, with judgment. Shingles need to seal, and in genuine cold that takes longer or needs hand sealing. Emergency work happens whenever it has to. Full replacements get scheduled around the weather rather than forced into it.

How do I know when a roof is getting close?

Granules collecting in the gutters, tabs lifting or curling at the edges, shingles that look bare in patches, and daylight or staining in the attic. Any of those is worth a look.

How long does a roof replacement take?

Most houses in this valley are a one to two day job once the crew is on site. Steeper pitches, multiple layers to strip and complicated roofs with a lot of valleys take longer, and we tell you which yours is before we start.

Ask about government roof inspections


Call (801) 382-8898 or send a note. We will look at the roof and tell you straight what it needs.