Skip to content

Government Roof Maintenance


Scheduled roof maintenance for government buildings.

Roof deck covered with blue-printed Sharkskin underlayment, gray parapet walls, wooded hills and cloudy sky beyond

What government roof maintenance involves


Drains cleared, seams checked, flashings and the sealant at penetrations looked at, and small problems fixed before they become leaks.

A low-slope roof that gets looked at regularly lasts far longer than one that only gets attention when it leaks.

Newly sheathed OSB roof deck marked with chalk lines beside an older gravel roof with scrap lumber
Low-slope roof stripped in patches, dark sheet torn away exposing OSB decking, satellite dish and tear-off shovel

What matters on government roof maintenance


Planning around the building

Government buildings stay in use while the roof is worked on. The plan covers where we get onto the roof, where material is staged and how the entrances stay clear, before anything comes off.

A record of the work

Public buildings need a file of what was done. We photograph each stage and record the materials used, so the next person responsible for that roof knows what is up there.

Bare wood plank roof decking after tear-off with loose pipe flashings, vent pipes and an open hole

A maintenance schedule


Spring and fall are the useful times on a roof here: after the snow and before it. Drains get cleared of what the winter left behind, and the seams and flashings get checked before the next freeze.

Each visit gets a short record with photographs, so there is a history of the roof when it is time to plan a replacement.

Service areaSalt Lake City & surrounding counties
Covering9 counties
In the trade27 years
As Hancock Signature8 years

How the system goes together


Flat roofs and the membrane choice

Low-slope roofs do not shed, they hold. TPO is a heat-welded white sheet that reflects a lot of the summer load. EPDM is a black rubber sheet that handles cold and movement well. PVC costs more and handles grease and chemicals, which is why it ends up over restaurant kitchens. Modified bitumen comes in rolls torched or adhered in layers, and built-up is the old tar-and-gravel assembly still sitting on plenty of buildings here.

Drainage beats material

Whichever sheet goes down, if the water does not get to a drain within a couple of days, the roof is going to fail early.

Coatings on a low-slope roof

A roof coating is a maintenance system, not a replacement. On a sound membrane or a metal roof with good fasteners, a properly prepped coating adds reflectivity and buys real years. Over a wet insulation layer or a membrane that has already delaminated, it is paint over a problem.

Prep is the whole job

Cleaning, seam treatment, and fixing what is actually broken take longer than rolling the coating on.

When coating is wrong

If a roof is done, coating it just delays the same conversation.

What we check

  • Field condition and granule loss
  • Valleys, ridges and every transition
  • Penetrations and their flashing
  • Gutter and fascia condition

How we approach it


1

Look first

We get on the roof and read what is actually happening before quoting anything.

2

Say what we find

Photographs and a plain explanation, including when the answer is that you do not need us yet.

3

Built in sequence

Crews we hire and run, working the right detail in the right order.

4

Leave it clean

Magnet over the yard, container gone, walked with you.

Moss and shade on the north side

Under mature trees on a shaded slope, the north face stays damp long after the rest of the roof has dried. Moss takes hold in that damp, and moss holds water against the mat and lifts shingle edges as it grows under them.

It is a cleaning problem first

Pressure washing an asphalt roof strips the granules and takes years off it. Gentle treatment, then clearing the overhanging limbs that keep the slope wet, is the order it should happen in.

Watch the gutter below

Moss coming off in the gutter is a sign the mat is losing surface too.

Thermal shock on metal and flashing

Metal moves. On a sunny winter day a standing seam panel or a piece of valley metal can run a hundred degrees warmer than the air, then drop back after dark. That expansion and contraction happens every clear day of the year here. Panels have to be fastened so they can move, clips have to be right, and a valley has to be detailed to slide instead of being pinned tight at both ends.

Pinned metal tears its own holes

When movement is blocked, the fastener holes elongate and that becomes the leak path.

House under construction with flat roofs covered in synthetic underlayment, metal panels stacked, scaffolding and mountains behind

What this looks like on a real roof


There is a version of government roof maintenance that gets sold off a clipboard in the driveway and a version that comes off actually reading the roof. The second one costs the same and lasts.

What follows is the part most people never get told: what usually went wrong before we arrived, and what the job looks like when it is done in the right order.

Where roofs go wrong


The shortcut we see most

Rooftop units and drains added over the years, with the roof patched around them instead of reworked. Those patches are where most public-building leaks start.

What good looks like instead

Every penetration, curb and drain flashed into the roof system properly, and a record of it in the facility file.

Signs worth a look

  • Water still standing days after a storm
  • Ceiling-tile stains near rooftop units
  • Seams lifting at the edges and parapets
  • The same area repaired more than once

What to expect


1

Before the job starts

A walk of the whole roof, photographs of what we found, and a plain written scope. We talk through access, staging and the building’s schedule before any work is planned.

2

While the work is underway

The building stays in use. Material is staged where it is out of the way, entrances stay clear, and the loudest work is planned around the schedule we are given.

3

When it is done

Photographs of each stage and a record of the materials installed, ready for the facility file.

Related work


Government covers more than one job, and they are not interchangeable. These are the others in the same family, each on its own page.

Full roof replacement on government buildings, planned around the building’s schedule.
Repairs on government roofs, traced to where the water actually gets in.
Commercial roof systems for government facilities, specified for the building.
Roofing for city halls, public works buildings and other municipal facilities.
Full roof replacement on municipal buildings, sequenced so the building stays in use.
Roof replacement on county buildings, from courthouses to road shops.
Roof replacement on state facilities, planned around fixed work windows.
Roof replacement on federal buildings, with the documentation and site conduct the work calls for.
School roof replacement planned around the school calendar.
Roof repair for libraries, rec centers and other public buildings.
Emergency roof repair on government buildings: the water gets stopped first.
Storm and hail damage on government roofs, documented and repaired.
Metal roofing on government and public buildings.
TPO membrane on government flat roofs.
EPDM membrane roofing on government buildings.
Flat and low-slope roofing on government buildings.
Roof coatings that add years to sound government roofs.
Waterproofing for government roofs, decks and parapets.
Roof inspections for government facilities, with photographs and a written record.
Roof restoration for government roofs with years left in them.

Questions we get asked


Not the question you had? Call the shop and ask a person. We would rather talk it through than have you guess from a website.

(801) 382-8898
Can you work while the building is in use?

Usually. We plan access, staging and the loudest work around the building’s schedule before the job starts.

Do you document the work?

Yes. Each stage is photographed and the materials are recorded, so the facility has a file of what was installed.

Can you look at several of our buildings?

Yes. We can inspect them all and give you a list in order of need, so the budget goes to the roof closest to failing.

How long does a roof replacement take?

Most houses in this valley are a one to two day job once the crew is on site. Steeper pitches, multiple layers to strip and complicated roofs with a lot of valleys take longer, and we tell you which yours is before we start.

What happens if you find bad decking?

We show you. The decking is only visible during a tear-off, so that is when soft sheathing gets found and replaced. We photograph it rather than just add it to a list.

What makes a Utah roof different?

Snow load, ice at the eaves, canyon wind and high-altitude sun, all on the same roof. A crew that learned roofing somewhere mild has to learn it again up here.

Ask about government roof maintenance


Call (801) 382-8898 or send a note. We will look at the roof and tell you straight what it needs.