Skip to content

Public Building Roof Repair


Roof repair for libraries, rec centers and other public buildings.

Roof deck covered in synthetic underlayment with wrapped chimney chase, staged metal trim and mountain view

What public building roof repair involves


We find the leak, rebuild that detail, and keep the building open while we do it.

A leak over a library or a gym floor costs more than the roof repair. Getting to the real entry point is what matters.

Newly sheathed OSB roof deck marked with chalk lines beside an older gravel roof with scrap lumber
Low-slope roof stripped in patches, dark sheet torn away exposing OSB decking, satellite dish and tear-off shovel

What matters on public building roof repair


Planning around the building

Government buildings stay in use while the roof is worked on. The plan covers where we get onto the roof, where material is staged and how the entrances stay clear, before anything comes off.

A record of the work

Public buildings need a file of what was done. We photograph each stage and record the materials used, so the next person responsible for that roof knows what is up there.

House under construction with flat roofs covered in synthetic underlayment, metal panels stacked, scaffolding and mountains behind

Repairs with people inside


Public buildings stay open, so repair work is planned around the people using them: where we get onto the roof, where the ladder or lift sits, and how the entrance stays clear.

Inside, we look at where the water shows up and trace it back on the roof. On these buildings the stain and the opening are often a long way apart.

Service areaSalt Lake City & surrounding counties
Covering9 counties
In the trade27 years
As Hancock Signature8 years

How the system goes together


Bringing an old metal roof back

A metal roof with sound panels and a tired finish is usually a candidate for restoration rather than replacement. Every exposed screw gets pulled and replaced one size up with a fresh washer, the seams and penetrations get reinforced, and then a coating system goes over the whole assembly to seal the thousands of small fastener points at once.

It only works on sound steel

Where the panel has rusted through, or where water has been getting into the insulation below for years, there is nothing for a coating to hold onto and we will say so.

A welded seam versus a glued one

On a single-ply roof, the seams are the whole roof. Heat welding fuses the two sheets into one piece of plastic, and a properly welded seam is stronger than the sheet either side of it. An adhesive seam relies on a bond that ages at a different rate than the membrane does.

How a seam gets proven

A probe run along the edge of every weld while the crew is still on the roof. If the probe catches, the seam gets rewelded then and there, not written down for later.

Cold days need slower welds

The machine settings change with the air temperature or the weld runs cold and looks fine.

What we check

  • Field condition and granule loss
  • Valleys, ridges and every transition
  • Penetrations and their flashing
  • Gutter and fascia condition

How we approach it


1

Look first

We get on the roof and read what is actually happening before quoting anything.

2

Say what we find

Photographs and a plain explanation, including when the answer is that you do not need us yet.

3

Built in sequence

Crews we hire and run, working the right detail in the right order.

4

Leave it clean

Magnet over the yard, container gone, walked with you.

Inversion keeps a roof damp

Winter here can park a lid of cold air over the valley floor for a week straight. Nothing dries during that stretch. A shaded slope that got wet on Monday is still wet on Friday, the sheathing under it never gives its moisture back to the air, and any lap that was going to wick does its wicking slowly with no interruption.

Gray weeks do quiet damage

Storms get blamed for roofs. Nine flat gray days with the sun never touching the north face do more, and nobody remembers them.

Southwest exposure ages fastest

If you only had time to look at one slope on a house here, look at the one facing between south and west. It takes the high sun through the middle of the day and it takes the afternoon heat, so the binder in the asphalt gives up there first. Cupped tabs, bare patches of mat, and a granule line in the gutter under that slope alone.

A roof can be two ages

And knowing that keeps a repair from turning into a replacement it did not need to be.

Roof deck covered with blue synthetic underlayment, staged shingle bundle, drip edge, and worker in hi-vis kneeling at eave

What this looks like on a real roof


There is a version of public building roof repair that gets sold off a clipboard in the driveway and a version that comes off actually reading the roof. The second one costs the same and lasts.

What follows is the part most people never get told: what usually went wrong before we arrived, and what the job looks like when it is done in the right order.

Where roofs go wrong


The shortcut we see most

Rooftop units and drains added over the years, with the roof patched around them instead of reworked. Those patches are where most public-building leaks start.

What good looks like instead

Every penetration, curb and drain flashed into the roof system properly, and a record of it in the facility file.

Signs worth a look

  • Water still standing days after a storm
  • Ceiling-tile stains near rooftop units
  • Seams lifting at the edges and parapets
  • The same area repaired more than once

What to expect


1

Before the job starts

A walk of the whole roof, photographs of what we found, and a plain written scope. We talk through access, staging and the building’s schedule before any work is planned.

2

While the work is underway

The building stays in use. Material is staged where it is out of the way, entrances stay clear, and the loudest work is planned around the schedule we are given.

3

When it is done

Photographs of each stage and a record of the materials installed, ready for the facility file.

Related work


Government covers more than one job, and they are not interchangeable. These are the others in the same family, each on its own page.

Full roof replacement on government buildings, planned around the building’s schedule.
Repairs on government roofs, traced to where the water actually gets in.
Commercial roof systems for government facilities, specified for the building.
Roofing for city halls, public works buildings and other municipal facilities.
Full roof replacement on municipal buildings, sequenced so the building stays in use.
Roof replacement on county buildings, from courthouses to road shops.
Roof replacement on state facilities, planned around fixed work windows.
Roof replacement on federal buildings, with the documentation and site conduct the work calls for.
School roof replacement planned around the school calendar.
Emergency roof repair on government buildings: the water gets stopped first.
Storm and hail damage on government roofs, documented and repaired.
Metal roofing on government and public buildings.
TPO membrane on government flat roofs.
EPDM membrane roofing on government buildings.
Flat and low-slope roofing on government buildings.
Roof coatings that add years to sound government roofs.
Waterproofing for government roofs, decks and parapets.
Roof inspections for government facilities, with photographs and a written record.
Scheduled roof maintenance for government buildings.
Roof restoration for government roofs with years left in them.

Questions we get asked


Not the question you had? Call the shop and ask a person. We would rather talk it through than have you guess from a website.

(801) 382-8898
Can you work while the building is in use?

Usually. We plan access, staging and the loudest work around the building’s schedule before the job starts.

Do you document the work?

Yes. Each stage is photographed and the materials are recorded, so the facility has a file of what was installed.

Can you look at several of our buildings?

Yes. We can inspect them all and give you a list in order of need, so the budget goes to the roof closest to failing.

Do you work through the winter?

Yes, with judgment. Shingles need to seal, and in genuine cold that takes longer or needs hand sealing. Emergency work happens whenever it has to. Full replacements get scheduled around the weather rather than forced into it.

How do I know when a roof is getting close?

Granules collecting in the gutters, tabs lifting or curling at the edges, shingles that look bare in patches, and daylight or staining in the attic. Any of those is worth a look.

How long does a roof replacement take?

Most houses in this valley are a one to two day job once the crew is on site. Steeper pitches, multiple layers to strip and complicated roofs with a lot of valleys take longer, and we tell you which yours is before we start.

Ask about public building roof repair


Call (801) 382-8898 or send a note. We will look at the roof and tell you straight what it needs.