Skip to content

County Roof Replacement


Roof replacement on county buildings, from courthouses to road shops.

Roof deck covered with blue-printed Sharkskin underlayment, gray parapet walls, wooded hills and cloudy sky beyond

What county roof replacement involves


Low-slope membrane, metal and shingle roofs replaced on county facilities, with each stage photographed for the county’s records.

County buildings run from older masonry courthouses to steel shop buildings, and each one needs its own plan.

Low-slope roof stripped in patches, dark sheet torn away exposing OSB decking, satellite dish and tear-off shovel
Newly sheathed OSB roof deck marked with chalk lines beside an older gravel roof with scrap lumber

What matters on county roof replacement


Planning around the building

Government buildings stay in use while the roof is worked on. The plan covers where we get onto the roof, where material is staged and how the entrances stay clear, before anything comes off.

A record of the work

Public buildings need a file of what was done. We photograph each stage and record the materials used, so the next person responsible for that roof knows what is up there.

Roof deck covered with printed self-adhered underlayment, gray metal trim pieces staged beside a framed chimney chase

Older county buildings


A lot of county buildings in northern Utah are older masonry with parapet walls and roofs that have been patched over the decades. The tear-off usually shows what the patching was hiding, and that is when the decking and flashing get fixed properly.

Newer county shops and storage buildings tend to be metal, and the work there is mostly fasteners, panel movement and how the snow comes off the roof.

Service areaSalt Lake City & surrounding counties
Covering9 counties
In the trade27 years
As Hancock Signature8 years

How the system goes together


Low-slope transitions over a porch

The spot that gives homeowners here the most trouble is where a nearly flat porch or addition roof meets a pitched main roof. Shingles need slope to work and a porch often does not have it, so the correct answer is a membrane on the low part carried up under the shingles above, with the transition detailed so nothing depends on a lap.

Shingles on a flat porch will leak

Not immediately, and not in every storm. But water sits on that plane after every event and shingles were never designed to hold water still.

Flat roofs and the membrane choice

Low-slope roofs do not shed, they hold. TPO is a heat-welded white sheet that reflects a lot of the summer load. EPDM is a black rubber sheet that handles cold and movement well. PVC costs more and handles grease and chemicals, which is why it ends up over restaurant kitchens. Modified bitumen comes in rolls torched or adhered in layers, and built-up is the old tar-and-gravel assembly still sitting on plenty of buildings here.

Drainage beats material

Whichever sheet goes down, if the water does not get to a drain within a couple of days, the roof is going to fail early.

What we check

  • Field condition and granule loss
  • Valleys, ridges and every transition
  • Penetrations and their flashing
  • Gutter and fascia condition

How we approach it


1

Look first

We get on the roof and read what is actually happening before quoting anything.

2

Say what we find

Photographs and a plain explanation, including when the answer is that you do not need us yet.

3

Built in sequence

Crews we hire and run, working the right detail in the right order.

4

Leave it clean

Magnet over the yard, container gone, walked with you.

Dust storms before the rain

Ahead of a summer cell the wind arrives dry and full of grit off the open ground west of here. That grit gets driven into every horizontal surface on a roof, then the rain lands on top of it and packs it into a paste in the valleys and the gutter seams.

Grit is an abrasive

It grinds at the mat under foot traffic and it holds moisture against metal long after the surface has dried.

So we clear twice a year

Once before summer, once after the leaves are down.

Southwest exposure ages fastest

If you only had time to look at one slope on a house here, look at the one facing between south and west. It takes the high sun through the middle of the day and it takes the afternoon heat, so the binder in the asphalt gives up there first. Cupped tabs, bare patches of mat, and a granule line in the gutter under that slope alone.

A roof can be two ages

And knowing that keeps a repair from turning into a replacement it did not need to be.

House under construction with flat roofs covered in synthetic underlayment, metal panels stacked, scaffolding and mountains behind

What this looks like on a real roof


There is a version of county roof replacement that gets sold off a clipboard in the driveway and a version that comes off actually reading the roof. The second one costs the same and lasts.

What follows is the part most people never get told: what usually went wrong before we arrived, and what the job looks like when it is done in the right order.

Where roofs go wrong


The shortcut we see most

Rooftop units and drains added over the years, with the roof patched around them instead of reworked. Those patches are where most public-building leaks start.

What good looks like instead

Every penetration, curb and drain flashed into the roof system properly, and a record of it in the facility file.

Signs worth a look

  • Water still standing days after a storm
  • Ceiling-tile stains near rooftop units
  • Seams lifting at the edges and parapets
  • The same area repaired more than once

What to expect


1

Before the job starts

A walk of the whole roof, photographs of what we found, and a plain written scope. We talk through access, staging and the building’s schedule before any work is planned.

2

While the work is underway

The building stays in use. Material is staged where it is out of the way, entrances stay clear, and the loudest work is planned around the schedule we are given.

3

When it is done

Photographs of each stage and a record of the materials installed, ready for the facility file.

Related work


Government covers more than one job, and they are not interchangeable. These are the others in the same family, each on its own page.

Full roof replacement on government buildings, planned around the building’s schedule.
Repairs on government roofs, traced to where the water actually gets in.
Commercial roof systems for government facilities, specified for the building.
Roofing for city halls, public works buildings and other municipal facilities.
Full roof replacement on municipal buildings, sequenced so the building stays in use.
Roof replacement on state facilities, planned around fixed work windows.
Roof replacement on federal buildings, with the documentation and site conduct the work calls for.
School roof replacement planned around the school calendar.
Roof repair for libraries, rec centers and other public buildings.
Emergency roof repair on government buildings: the water gets stopped first.
Storm and hail damage on government roofs, documented and repaired.
Metal roofing on government and public buildings.
TPO membrane on government flat roofs.
EPDM membrane roofing on government buildings.
Flat and low-slope roofing on government buildings.
Roof coatings that add years to sound government roofs.
Waterproofing for government roofs, decks and parapets.
Roof inspections for government facilities, with photographs and a written record.
Scheduled roof maintenance for government buildings.
Roof restoration for government roofs with years left in them.

Questions we get asked


Not the question you had? Call the shop and ask a person. We would rather talk it through than have you guess from a website.

(801) 382-8898
Can you work while the building is in use?

Usually. We plan access, staging and the loudest work around the building’s schedule before the job starts.

Do you document the work?

Yes. Each stage is photographed and the materials are recorded, so the facility has a file of what was installed.

Can you look at several of our buildings?

Yes. We can inspect them all and give you a list in order of need, so the budget goes to the roof closest to failing.

What happens if you find bad decking?

We show you. The decking is only visible during a tear-off, so that is when soft sheathing gets found and replaced. We photograph it rather than just add it to a list.

What makes a Utah roof different?

Snow load, ice at the eaves, canyon wind and high-altitude sun, all on the same roof. A crew that learned roofing somewhere mild has to learn it again up here.

Will you tell me if I do not need a new roof?

Yes. Plenty of what we look at turns out to be a repair, and we say so. A roof with years left in it gets left alone, and you get the photographs either way.

Ask about county roof replacement


Call (801) 382-8898 or send a note. We will look at the roof and tell you straight what it needs.