Skip to content

Government Flat Roofing


Flat and low-slope roofing on government buildings.

Roof deck covered with blue-printed Sharkskin underlayment, gray parapet walls, wooded hills and cloudy sky beyond

What government flat roofing involves


We start with where the water goes: slope, drains and scuppers. Then we choose and install the membrane.

Ponding water is what kills flat roofs, whatever membrane is on them.

Newly sheathed OSB roof deck marked with chalk lines beside an older gravel roof with scrap lumber
Low-slope roof stripped in patches, dark sheet torn away exposing OSB decking, satellite dish and tear-off shovel

What matters on government flat roofing


Drainage before material

The first question on any low-slope roof is where the water goes. Ponding is what kills membranes, and a roof that holds water for days after a storm will fail early regardless of which sheet is on it. We look at the slope, the drains and the terminations before we talk about material.

Seams and terminations

Field failures on commercial roofs are rare. Failures at seams, curbs, drains and the parapet edge are common. A hot-air welded seam that has been probed is a continuous sheet. Anything taped or glued and unverified is a scheduled leak.

Roof deck covered with blue synthetic underlayment, staged shingle bundle, drip edge, and worker in hi-vis kneeling at eave

Drainage on a flat roof


A flat roof that holds water for days after a storm will fail early. Before material goes up, we look at the drains, the slope and whether tapered insulation is needed to move the water.

On older public buildings, drains get added or moved as the building changes, and the roof around them rarely gets reworked. That is usually where the trouble is.

Service areaSalt Lake City & surrounding counties
Covering9 counties
In the trade27 years
As Hancock Signature8 years

How the system goes together


Flashing is where roofs leak

Very few roofs fail in the field of the shingles. They fail at the transitions, at a wall, a chimney, a skylight curb, a pipe boot, a valley. Good flashing is metal shaped so water has nowhere to go but out. Bad flashing is sealant spread over a gap and a hope that nobody looks for four years. When we pull a roof apart, the flashing is what tells us whether the last crew was in a hurry.

Step flashing is one piece per course

There is no shortcut version of that detail that works.

Pipe boots and roof penetrations

The rubber collar around a plumbing vent is the shortest-lived thing on most roofs. Ultraviolet at this elevation cracks that rubber long before the shingles are tired, and the crack sits directly over an open hole in the deck. Lead boots or a metal collar with a replaceable seal last considerably longer.

Everything that comes through gets a plan

Furnace flues, swamp cooler curbs, satellite mounts, solar standoffs. Each one is a hole somebody has to detail correctly.

What we check

  • Field condition and granule loss
  • Valleys, ridges and every transition
  • Penetrations and their flashing
  • Gutter and fascia condition

How we approach it


1

Look first

We get on the roof and read what is actually happening before quoting anything.

2

Say what we find

Photographs and a plain explanation, including when the answer is that you do not need us yet.

3

Built in sequence

Crews we hire and run, working the right detail in the right order.

4

Leave it clean

Magnet over the yard, container gone, walked with you.

Wind, water and dust, in that order

Ask what actually kills roofs in this part of the state and the answer runs wind first, then water that could not get away, then the grit that the wind delivered. Each one makes the next worse. A wind-broken seal lets water in. Water carries grit into a lap. Grit holds moisture against the mat. None of it is dramatic and all of it compounds.

Why we start at the edges

Perimeters and penetrations are where all three arrive together, so that is where an honest look begins.

Spring wind off the benches

Canyon wind is the thing homeowners here tend to shrug off. It does not arrive as a steady push, it arrives in gusts that lift a shingle tab, break the seal strip, and set it down again looking fine. Three or four of those and the tab is loose, water gets a path, and nobody knows until a ceiling stains.

Rakes and ridges go first

Edges take the uplift. That is why we nail the rake tighter, use a starter course with a factory seal at the eave, and look at ridge caps before anything else after a blow.

House under construction with flat roofs covered in synthetic underlayment, metal panels stacked, scaffolding and mountains behind

What this looks like on a real roof


There is a version of government flat roofing that gets sold off a clipboard in the driveway and a version that comes off actually reading the roof. The second one costs the same and lasts.

What follows is the part most people never get told: what usually went wrong before we arrived, and what the job looks like when it is done in the right order.

Where roofs go wrong


The shortcut we see most

A membrane laid over wet insulation because tearing off would have cost a day. The roof looks finished, the moisture stays underneath, and the sheet fails early from below.

What good looks like instead

Moisture surveyed, wet sections cut out and replaced, drainage corrected, then the membrane installed and its seams probed.

Signs worth a look

  • Ponding water still standing two days after rain
  • Seams that have lifted or opened at an edge
  • Blisters or ridging across the field
  • Interior staining near drains, curbs or the parapet

What to expect


1

Scheduling around your operation

Most commercial work can be staged so the disruptive part happens when the building is quiet. Tear-off noise, crane or hoist time and material deliveries all get planned against your hours rather than ours.

2

What the roof survey covers

Before specifying anything we survey the existing assembly: slope and drainage, moisture in the insulation, the condition of seams and terminations, and how the roof is being used. A roof somebody walks on weekly needs a different answer from one nobody touches.

3

Documentation

Commercial and public work runs on records. We photograph the existing condition, the work in progress and the finished assembly, so there is a file rather than a recollection.

Related work


Government covers more than one job, and they are not interchangeable. These are the others in the same family, each on its own page.

Full roof replacement on government buildings, planned around the building’s schedule.
Repairs on government roofs, traced to where the water actually gets in.
Commercial roof systems for government facilities, specified for the building.
Roofing for city halls, public works buildings and other municipal facilities.
Full roof replacement on municipal buildings, sequenced so the building stays in use.
Roof replacement on county buildings, from courthouses to road shops.
Roof replacement on state facilities, planned around fixed work windows.
Roof replacement on federal buildings, with the documentation and site conduct the work calls for.
School roof replacement planned around the school calendar.
Roof repair for libraries, rec centers and other public buildings.
Emergency roof repair on government buildings: the water gets stopped first.
Storm and hail damage on government roofs, documented and repaired.
Metal roofing on government and public buildings.
TPO membrane on government flat roofs.
EPDM membrane roofing on government buildings.
Roof coatings that add years to sound government roofs.
Waterproofing for government roofs, decks and parapets.
Roof inspections for government facilities, with photographs and a written record.
Scheduled roof maintenance for government buildings.
Roof restoration for government roofs with years left in them.

Questions we get asked


Not the question you had? Call the shop and ask a person. We would rather talk it through than have you guess from a website.

(801) 382-8898
Which membrane is right for my building?

It depends on the traffic, the exposure and what comes out of the exhaust. TPO and PVC are welded and light, EPDM is proven and has fewer seams in wide sheets, mod-bit and built-up are heavier assemblies. We specify for the building rather than for what is on the truck.

Can you work around our business hours?

Usually. Most commercial work can be staged so the noisy part happens when the building is quiet, and we talk about that before the schedule is set.

How long does a commercial membrane last?

It depends far more on drainage and detailing than on the sheet itself. A membrane with standing water on it and a membrane that drains properly will not last the same length of time.

Will you tell me if I do not need a new roof?

Yes. Plenty of what we look at turns out to be a repair, and we say so. A roof with years left in it gets left alone, and you get the photographs either way.

Do you handle the insurance side?

On hail-damaged roofs, we work with your insurance to get the roof covered. We document the damage thoroughly with photographs, so the claim reflects what is actually on the roof.

Do you work through the winter?

Yes, with judgment. Shingles need to seal, and in genuine cold that takes longer or needs hand sealing. Emergency work happens whenever it has to. Full replacements get scheduled around the weather rather than forced into it.

Ask about government flat roofing


Call (801) 382-8898 or send a note. We will look at the roof and tell you straight what it needs.