What municipality roofing involves

Repair, replacement and maintenance on the buildings a city runs, from the offices to the maintenance yard.

A city usually owns several buildings of different ages on different roofs. Knowing all of them lets the work be planned over years instead of in emergencies.

Low-slope roof stripped in patches, dark sheet torn away exposing OSB decking, satellite dish and tear-off shovel
Newly sheathed OSB roof deck marked with chalk lines beside an older gravel roof with scrap lumber

What matters on municipality roofing

Planning around the building

Government buildings stay in use while the roof is worked on. The plan covers where we get onto the roof, where material is staged and how the entrances stay clear, before anything comes off.

A record of the work

Public buildings need a file of what was done. We photograph each stage and record the materials used, so the next person responsible for that roof knows what is up there.

Roof deck covered with blue synthetic underlayment, staged shingle bundle, drip edge, and worker in hi-vis kneeling at eave

Working with a city

Municipal roofs come in groups: a city hall, a fire station, a public works yard, a park building. Each has its own roof and its own age, and the useful thing is a plain picture of which one needs attention first.

We can walk all of them, photograph what we find and give you a list in order of need, so the roofing budget goes to the roof that is closest to failing.

We work Salt Lake City & surrounding counties, 9 counties in all, with 27 years in the trade and the last 8 as Hancock Signature.

How the system goes together

Bringing an old metal roof back

A metal roof with sound panels and a tired finish is usually a candidate for restoration rather than replacement. Every exposed screw gets pulled and replaced one size up with a fresh washer, the seams and penetrations get reinforced, and then a coating system goes over the whole assembly to seal the thousands of small fastener points at once.

It only works on sound steel

Where the panel has rusted through, or where water has been getting into the insulation below for years, there is nothing for a coating to hold onto and we will say so.

Flat roofs and the membrane choice

Low-slope roofs do not shed, they hold. TPO is a heat-welded white sheet that reflects a lot of the summer load. EPDM is a black rubber sheet that handles cold and movement well. PVC costs more and handles grease and chemicals, which is why it ends up over restaurant kitchens. Modified bitumen comes in rolls torched or adhered in layers, and built-up is the old tar-and-gravel assembly still sitting on plenty of buildings here.

Drainage beats material

Whichever sheet goes down, if the water does not get to a drain within a couple of days, the roof is going to fail early.

What we check

  • Field condition and granule loss
  • Valleys, ridges and every transition
  • Penetrations and their flashing
  • Gutter and fascia condition

How we approach it

1

Look first

We get on the roof and read what is actually happening before quoting anything.

2

Say what we find

Photographs and a plain explanation, including when the answer is that you do not need us yet.

3

Built in sequence

Crews we hire and run, working the right detail in the right order.

4

Leave it clean

Magnet over the yard, container gone, walked with you.

Elevation changes the whole calendar

A roof at the top of a canyon and a roof on the valley floor are on different schedules. Up high the snow arrives in October and is still there in May, the freeze cycles are deeper, and the ultraviolet load in the thin air is harsher year round. Down low there are more melt-and-refreeze swings and fewer feet of standing load.

Same materials, different details

The ice barrier runs further, the ventilation gets sized up, and the fastening schedule tightens as the elevation goes up.

Moss and shade on the north side

Under mature trees on a shaded slope, the north face stays damp long after the rest of the roof has dried. Moss takes hold in that damp, and moss holds water against the mat and lifts shingle edges as it grows under them.

It is a cleaning problem first

Pressure washing an asphalt roof strips the granules and takes years off it. Gentle treatment, then clearing the overhanging limbs that keep the slope wet, is the order it should happen in.

Watch the gutter below

Moss coming off in the gutter is a sign the mat is losing surface too.

Roof deck covered with blue-printed Sharkskin underlayment, gray parapet walls, wooded hills and cloudy sky beyond

What this looks like on a real roof

There is a version of municipality roofing that gets sold off a clipboard in the driveway and a version that comes off actually reading the roof. The second one costs the same and lasts.

What follows is the part most people never get told: what usually went wrong before we arrived, and what the job looks like when it is done in the right order.

Where roofs go wrong

The shortcut we see most

Rooftop units and drains added over the years, with the roof patched around them instead of reworked. Those patches are where most public-building leaks start.

What good looks like instead

Every penetration, curb and drain flashed into the roof system properly, and a record of it in the facility file.

Signs worth a look

  • Water still standing days after a storm
  • Ceiling-tile stains near rooftop units
  • Seams lifting at the edges and parapets
  • The same area repaired more than once

What to expect

1

Before the job starts

A walk of the whole roof, photographs of what we found, and a plain written scope. We talk through access, staging and the building’s schedule before any work is planned.

2

While the work is underway

The building stays in use. Material is staged where it is out of the way, entrances stay clear, and the loudest work is planned around the schedule we are given.

3

When it is done

Photographs of each stage and a record of the materials installed, ready for the facility file.

Related work

Government covers more than one job, and they are not interchangeable. These are the others in the same family, each on its own page.

Full roof replacement on government buildings, planned around the building’s schedule.
Repairs on government roofs, traced to where the water actually gets in.
Commercial roof systems for government facilities, specified for the building.
Full roof replacement on municipal buildings, sequenced so the building stays in use.
Roof replacement on county buildings, from courthouses to road shops.
Roof replacement on state facilities, planned around fixed work windows.
Roof replacement on federal buildings, with the documentation and site conduct the work calls for.
School roof replacement planned around the school calendar.
Roof repair for libraries, rec centers and other public buildings.
Emergency roof repair on government buildings: the water gets stopped first.
Storm and hail damage on government roofs, documented and repaired.
Metal roofing on government and public buildings.
TPO membrane on government flat roofs.
EPDM membrane roofing on government buildings.
Flat and low-slope roofing on government buildings.
Roof coatings that add years to sound government roofs.
Waterproofing for government roofs, decks and parapets.
Roof inspections for government facilities, with photographs and a written record.
Scheduled roof maintenance for government buildings.
Roof restoration for government roofs with years left in them.

Questions we get asked

Not the question you had? Call the shop and ask a person. We would rather talk it through than have you guess from a website.

(801) 382-8898
Can you work while the building is in use?

Usually. We plan access, staging and the loudest work around the building’s schedule before the job starts.

Do you document the work?

Yes. Each stage is photographed and the materials are recorded, so the facility has a file of what was installed.

Can you look at several of our buildings?

Yes. We can inspect them all and give you a list in order of need, so the budget goes to the roof closest to failing.

What makes a Utah roof different?

Snow load, ice at the eaves, canyon wind and high-altitude sun, all on the same roof. A crew that learned roofing somewhere mild has to learn it again up here.

Will you tell me if I do not need a new roof?

Yes. Plenty of what we look at turns out to be a repair, and we say so. A roof with years left in it gets left alone, and you get the photographs either way.

Do you handle the insurance side?

On hail-damaged roofs, we work with your insurance to get the roof covered. We document the damage thoroughly with photographs, so the claim reflects what is actually on the roof.

Talk to Hancock

Ask about municipality roofing

Call (801) 382-8898 or send a note. We will look at the roof and tell you straight what it needs.