Skip to content
Black membrane flat roof with flashed brick chimney and vent pipe beside weathered cedar shake slopes

Ogden, Utah

EPDM Roofing around Ogden

Black rubber membrane, proven over decades.

Talk to Hancock(801) 382-8898

EPDM Roofing for Ogden homes and buildings

EPDM in the widest practical sheets to minimise seams, with detailed terminations.

A lot of Ogden’s housing stock is brick and craftsman with steeper pitches and real character, and roofs there reward being detailed properly rather than covered quickly. Valleys and chimney flashing are where these houses leak.

Fewer seams, fewer failure points. Sheet layout is most of the job.

What matters on EPDM roofing

Drainage before material

The first question on any low-slope roof is where the water goes. Ponding is what kills membranes, and a roof that holds water for days after a storm will fail early regardless of which sheet is on it. We look at the slope, the drains and the terminations before we talk about material.

Seams and terminations

Field failures on commercial roofs are rare. Failures at seams, curbs, drains and the parapet edge are common. A hot-air welded seam that has been probed is a continuous sheet. Anything taped or glued and unverified is a scheduled leak.

How the system goes together

A welded seam versus a glued one

On a single-ply roof, the seams are the whole roof. Heat welding fuses the two sheets into one piece of plastic, and a properly welded seam is stronger than the sheet either side of it. An adhesive seam relies on a bond that ages at a different rate than the membrane does.

How a seam gets proven

A probe run along the edge of every weld while the crew is still on the roof. If the probe catches, the seam gets rewelded then and there, not written down for later.

Cold days need slower welds

The machine settings change with the air temperature or the weld runs cold and looks fine.

Decking is the part nobody plans for

The sheathing under the roof only gets looked at once every couple of decades, which is when the old roof comes off. Older homes up here might have skip sheathing, plank decking with gaps, or plywood that has been soft over a leak for years. It gets replaced where it is bad, because fasteners do not hold in punky wood and a soft deck telegraphs every wave through a new roof.

It is measured, not guessed

Sheet count gets documented once the roof is open, before anything goes back down.

What we check

  • Field condition and granule loss
  • Valleys, ridges and every transition
  • Penetrations and their flashing
  • Gutter and fascia condition

What the job looks like

1

Get on the roof

We walk it rather than look from the drive, check the decking underfoot, the flashings and the ventilation, and photograph what we find before any number is discussed.

2

Show you what we saw

The photographs come back to you with a plain read of what the roof needs and, just as often, what it does not need yet.

3

Crew on site

The crews we hire work under Hancock’s direction, staged so landscaping and the drive are protected, working the detail in the order it is supposed to go on rather than the order that is quickest.

4

Leave it clean

Site cleared at the end of every day, a magnet run over the whole yard for nails at the finish, and the roof walked with you before we go.

Two seasons of roof weather

Roofs here really only get two conditions and both are hard. There is the cold half, where everything is about snow load, ice at the eave and condensation under the deck. Then there is the hot dry half, where ultraviolet and surface heat cook the asphalt and the only water that arrives comes fast and sideways. Systems that do fine in a mild climate get worn from both ends up here.

Building for both

The details that handle winter and the details that handle summer are different details, and a roof has to carry both sets.

Microclimate changes street to street

Two homes ten minutes apart can be on completely different roofs in terms of what they endure. Elevation, whether the lot sits in a canyon draw, how much tree cover is overhead, and which direction the main slope faces all change the answer. A roof age that is fine on a shaded north-facing bench home is well past done on an exposed south-facing lot at a higher elevation.

Why we look before we talk

That is the reason we get on a roof before saying anything about it.

Where roofs go wrong

The shortcut we see most

A membrane laid over wet insulation because tearing off would have cost a day. The roof looks finished, the moisture stays underneath, and the sheet fails early from below.

What good looks like instead

Moisture surveyed, wet sections cut out and replaced, drainage corrected, then the membrane installed and its seams probed.

Signs worth a look

  • Ponding water still standing two days after rain
  • Seams that have lifted or opened at an edge
  • Blisters or ridging across the field
  • Interior staining near drains, curbs or the parapet

Part of our Weber County work, out of Salt Lake City & surrounding counties. A full replacement carries our 10-year workmanship warranty.

What to expect

1

Scheduling around your operation

Most commercial work can be staged so the disruptive part happens when the building is quiet. Tear-off noise, crane or hoist time and material deliveries all get planned against your hours rather than ours.

2

What the roof survey covers

Before specifying anything we survey the existing assembly: slope and drainage, moisture in the insulation, the condition of seams and terminations, and how the roof is being used. A roof somebody walks on weekly needs a different answer from one nobody touches.

3

Documentation

Commercial and public work runs on records. We photograph the existing condition, the work in progress and the finished assembly, so there is a file rather than a recollection.

Getting to Ogden

Working Ogden regularly rather than occasionally is what makes an honest read possible. We have been on enough roofs across Weber County to know which subdivisions came from the same builder and inherited the same shortcut.

That proximity is most of what matters when weather moves through. Ogden sits in Weber County, and we are on roofs across it regularly enough to know how the housing there was built.

Questions we get asked

Not the question you had? Call the shop and ask a person. We would rather talk it through than have you guess from a website.

(801) 382-8898
Do you actually work in Ogden?

Yes. Ogden sits inside the ground we cover around Salt Lake City, and the crew is there most weeks rather than once a season.

How fast can you get to Ogden after a storm?

As fast as we can get there. Stopping the water comes first and the permanent repair follows once the weather opens a window.

How do I know when a roof is getting close?

Granules collecting in the gutters, tabs lifting or curling at the edges, shingles that look bare in patches, and daylight or staining in the attic. Any of those is worth a look.

Will you tell me if I do not need a new roof?

Yes. Plenty of what we look at turns out to be a repair, and we say so. A roof with years left in it gets left alone, and you get the photographs either way.

How long does a roof replacement take?

Most houses in this valley are a one to two day job once the crew is on site. Steeper pitches, multiple layers to strip and complicated roofs with a lot of valleys take longer, and we tell you which yours is before we start.

Where Ogden sits on our map

We cover Ogden on the regular route rather than treating it as a trip.

Talk to Hancock

EPDM Roofing in Ogden

Call (801) 382-8898.

Have us look at it(801) 382-8898See recent work