Skip to content

Roof Replacement around Riverton


A full tear-off and rebuild when patching stops making sense.

Two roofers on a shingle roof ridge, one cutting decking with a circular saw as sawdust flies

Roof Replacement for Riverton homes and buildings


We strip the old roof to the deck, replace any sheathing that has gone soft, set new drip edge and flashing where it is needed, lay underlayment and ice barrier where the eaves need it, then shingle from the starter course up.

Winter here does the damage in April rather than January. Wet spring snow runs far heavier per foot than dry powder, and a roof in Riverton that carried three feet in February can groan under eighteen inches of the wet stuff two months later. Pitch, sheathing condition and whether the framing was sized for the zone all decide how that load comes off.

A replacement is the one time the whole assembly is open. Ventilation, flashing and decking all get fixed at once instead of one at a time.

Stripped roof of bare wood plank decking with valley, gaps and holes, worker's boot at bottom, in Riverton, UT

What matters on roof replacement


What we find most often

On houses in this valley the three recurring findings are unbalanced ventilation, flashing that was sealed rather than formed, and decking that went soft under a valley nobody could see into. All three are invisible from the ground and all three are cheap to fix while the roof is already open.

What the age of the house tells us

A house built in the 1950s, one built in the 1980s and one built last year each fail differently. Older stock tends to have thinner decking and original framing that was never sized for a second layer of shingles. Houses from the building booms tend to share a builder’s ventilation shortcut across a whole subdivision. New construction usually fails at a detail somebody rushed to hit a schedule.

Roof Replacement around Riverton


Shingle roof edge opened at the eave, exposing rafter tails and dark fascia board behind a white gutter, in Riverton, UT
Shingle roof edge opened at the eave, exposing rafter tails and dark fascia board behind a white gutter, in Riverton, UT
Workers on a steep roof re-sheathed with bare OSB decking beside old boards and a brick chimney, in Riverton, UT
Workers on a steep roof re-sheathed with bare OSB decking beside old boards and a brick chimney, in Riverton, UT
Two roofers on bare plywood deck with underlayment rolls, tools and shingle bundles during a tear-off, in Riverton, UT
Two roofers on bare plywood deck with underlayment rolls, tools and shingle bundles during a tear-off, in Riverton, UT

How the system goes together


Counterflashing let into the masonry

Where a roof meets brick or stone, the honest detail cuts a groove into a mortar joint, tucks the top edge of the metal into it, and seals the groove. Water running down the wall face hits metal and gets thrown out onto the roof. The shortcut runs the metal flat up the wall and caulks the top edge, which works until the caulk moves.

Surface-mounted is a temporary answer

We will do it that way on an emergency repair and tell you plainly that it needs to be cut in properly when there is time.

How long a bead of sealant lasts

Roof sealant is a consumable. In this climate, with the ultraviolet load and the temperature swing, a good product stays flexible for a handful of years and then shrinks, crazes and pulls away from one side of the joint. That is normal and expected behavior for the material.

Design so sealant is a backup

Every joint that matters should shed water by its shape, with the sealant there as a second line. Where sealant is the only thing standing between water and the deck, somebody has signed you up for a maintenance visit every few years.

Ask what is holding a repair together

If the answer is caulk, ask again.

What we check

  • Decking condition underfoot across the whole plane
  • Fastener pattern on the existing sheathing
  • Whether there are one or two existing layers
  • Flashing that will need rebuilding rather than reusing

What the job looks like


1

Get on the roof

We walk it rather than look from the drive, check the decking underfoot, the flashings and the ventilation, and photograph what we find before any number is discussed.

2

Show you what we saw

The photographs come back to you with a plain read of what the roof needs and, just as often, what it does not need yet.

3

Crew on site

The crews we hire work under Hancock’s direction, staged so landscaping and the drive are protected, working the detail in the order it is supposed to go on rather than the order that is quickest.

4

Leave it clean

Site cleared at the end of every day, a magnet run over the whole yard for nails at the finish, and the roof walked with you before we go.

Cold nights pull condensation into the attic

A lot of what people call a roof leak up here is not a leak. Warm moist air from the house rises into an attic, hits a deck that is well below freezing, and condenses on the underside of the sheathing. In the morning it drips. Homeowners see a wet spot and think shingles, when the problem is that the attic is not moving air.

Frost on nail points

We look for rust rings and frost on the nail shanks. That pattern tells you it is condensation before a single shingle comes off.

Wind, water and dust, in that order

Ask what actually kills roofs in this part of the state and the answer runs wind first, then water that could not get away, then the grit that the wind delivered. Each one makes the next worse. A wind-broken seal lets water in. Water carries grit into a lap. Grit holds moisture against the mat. None of it is dramatic and all of it compounds.

Why we start at the edges

Perimeters and penetrations are where all three arrive together, so that is where an honest look begins.

Where roofs go wrong


The shortcut we see most

Shingles laid over a second existing layer to save a tear-off. It hides the decking, adds weight the framing was not sized for, and guarantees that the next roof is a bigger job than this one should have been.

What good looks like instead

Down to the deck, sheathing repaired where it is soft, ice barrier where the eaves need it, and the flashing formed rather than sealed.

Signs worth a look

  • Granules collecting in the gutters or at the downspout discharge
  • Tabs lifting or curling along a rake or ridge
  • Shingles that look bare or patchy from the street
  • Staining or daylight visible in the attic
Service areaSalt Lake City & surrounding counties
CountySalt Lake
In the trade27 years
Workmanship warranty10 years

What to expect


1

How long it takes

Most houses in this valley are one to two days on site once the crew arrives. What stretches it is pitch, the number of existing layers to strip, and how many valleys and penetrations the roof has. We tell you which of those apply to yours before the schedule is set.

2

What happens to your yard

Tarps go down over landscaping and the drive before anything comes off the roof. Material is staged where it will not crack concrete. At the end of every day the site gets cleared, and when the job is finished a magnet goes over the whole yard for nails.

3

What you should expect from us

A walk of the roof before anything is quoted, photographs of what we found, a plain explanation of what needs doing and what does not, and Hancock answering for the job through to the finish.

Two workers on a stripped roof of weathered board decking, with new OSB sheathing panels laid along the upper slope, in Riverton, UT
White-sided house with tan asphalt shingle hip roof, small dormer window and metal ridge vent against blue sky, in Riverton, UT

Getting to Riverton


On a booked replacement the calendar does most of the work. On the day something fails at a Riverton house, stopping the water comes first and the real repair follows.

That proximity is most of what matters when weather moves through. Riverton sits in Salt Lake County, and we are on roofs across it regularly enough to know how the housing there was built.

Questions we get asked


Not the question you had? Call the shop and ask a person. We would rather talk it through than have you guess from a website.

(801) 382-8898
Do you actually work in Riverton?

Yes, and often. Riverton is part of our regular service area, so it is ground we know well.

How fast can you get to Riverton after a storm?

We stop the water first. Temporary work is genuinely temporary and we say so, but it buys the time to do the actual repair right.

What makes a Utah roof different?

Snow load, ice at the eaves, canyon wind and high-altitude sun, all on the same roof. A crew that learned roofing somewhere mild has to learn it again up here.

How do I know when a roof is getting close?

Granules collecting in the gutters, tabs lifting or curling at the edges, shingles that look bare in patches, and daylight or staining in the attic. Any of those is worth a look.

Will you tell me if I do not need a new roof?

Yes. Plenty of what we look at turns out to be a repair, and we say so. A roof with years left in it gets left alone, and you get the photographs either way.

Where Riverton sits on our map


Riverton work is scheduled like the rest of the valley.

Roof Replacement in Riverton


Call (801) 382-8898.