Skip to content

Metal Roofing around Cottonwood Heights


Metal roofs that shed snow and last decades.

Roof under construction: synthetic underlayment, partly installed standing-seam metal panels, flat-capped tower, wooded hills behind

Metal Roofing for Cottonwood Heights homes and buildings


Standing seam and exposed-fastener panels over the right underlayment, with movement allowed for.

A slow leak around Cottonwood Heights rarely announces itself. It wets sheathing, dries, wets it again, and does that for two or three seasons until the decking has gone soft over an area far larger than the stain downstairs suggests.

Metal moves with temperature. A metal roof fails where somebody pinned it down.

Roof under construction: blue-printed underlayment, staged gray metal panels, workers, mountains and juniper hills beyond, in Cottonwood Heights, UT

What matters on metal roofing


Movement is the design problem

Metal expands and contracts with temperature across the whole length of a panel. A metal roof that was pinned down rather than allowed to move will oil-can, work its fasteners loose, or tear at a fixing point. The clip and fastener strategy is the engineering.

Where metal earns its keep

At elevation, where snow sits for months, a metal roof sheds load instead of carrying it. That single property is why so much of the high country is metal.

How the system goes together


Flashing is where roofs leak

Very few roofs fail in the field of the shingles. They fail at the transitions, at a wall, a chimney, a skylight curb, a pipe boot, a valley. Good flashing is metal shaped so water has nowhere to go but out. Bad flashing is sealant spread over a gap and a hope that nobody looks for four years. When we pull a roof apart, the flashing is what tells us whether the last crew was in a hurry.

Step flashing is one piece per course

There is no shortcut version of that detail that works.

Fasteners rust from the inside out

Screws and nails on a roof within reach of the lake air corrode faster than the same hardware would inland. A plain steel nail head disappears under a shingle and takes years off the roof’s hold without a single visible symptom. Hot-dipped galvanized or stainless where the metal is exposed is a small line item that decides whether the roof reaches its rated life.

Mixed metals make it worse

Aluminum flashing pinned with the wrong screw sets up a reaction that eats the softer metal at every contact point.

We look at the old nails

What came out of the last roof tells you what to put in the new one.

What we check

  • Panel profile and gauge against the snow load
  • Clip spacing and room left for movement
  • Underlayment rated for the heat under metal
  • Trim at the eaves, rakes and walls

What the job looks like


1

Get on the roof

We walk it rather than look from the drive, check the decking underfoot, the flashings and the ventilation, and photograph what we find before any number is discussed.

2

Show you what we saw

The photographs come back to you with a plain read of what the roof needs and, just as often, what it does not need yet.

3

Crew on site

The crews we hire work under Hancock’s direction, staged so landscaping and the drive are protected, working the detail in the order it is supposed to go on rather than the order that is quickest.

4

Leave it clean

Site cleared at the end of every day, a magnet run over the whole yard for nails at the finish, and the roof walked with you before we go.

The rot that follows a slow leak

The dangerous leak is not the one that stains a ceiling in a week. It is the one that puts a cup of water into a rafter bay every storm for four years. Nothing shows inside because the insulation absorbs it and the attic dries out between events, while the sheathing goes dark, then soft, then delaminates around the fasteners.

How we find it

Daylight through the deck from inside the attic, rust at the nail points, and a sheathing surface that gives under a knuckle.

Wood is the expensive part

Shingles are a material cost. Structure is not.

Elevation changes the whole calendar

A roof at the top of a canyon and a roof on the valley floor are on different schedules. Up high the snow arrives in October and is still there in May, the freeze cycles are deeper, and the ultraviolet load in the thin air is harsher year round. Down low there are more melt-and-refreeze swings and fewer feet of standing load.

Same materials, different details

The ice barrier runs further, the ventilation gets sized up, and the fastening schedule tightens as the elevation goes up.

Where roofs go wrong


The shortcut we see most

Panels fastened tight at both ends with no allowance for movement. The roof oil-cans in summer, works its fasteners loose over a few seasons, and tears at a fixing point.

What good looks like instead

Clips and fasteners that let the panel move with temperature, and terminations detailed for the expansion the metal will actually see.

Signs worth a look

  • Fasteners backing out or their washers cracked
  • Panels oil-canning visibly along a run
  • Seams opening at a termination
  • Rust starting at a cut edge or penetration
Service areaSalt Lake City & surrounding counties
CountySalt Lake
In the trade27 years
Workmanship warranty10 years

What to expect


1

Lifespan against cost

Metal costs more up front and lasts considerably longer. Whether that is the right trade depends on how long you intend to be in the building, and we will talk through that honestly rather than push the bigger job.

2

Snow behaviour

Metal sheds snow, which is an advantage at elevation and a hazard over a walkway or a door. Snow retention gets designed in where the building needs it rather than added after somebody gets hit.

3

Noise and insulation

Over a solid deck with underlayment, a metal roof is not appreciably louder than asphalt. The drumming people remember is metal over open purlins on an outbuilding.

Getting to Cottonwood Heights


Cottonwood Heights is part of our regular service area around Salt Lake City, so a roof there gets walked before it gets priced.

That proximity is most of what matters when weather moves through. Cottonwood Heights sits in Salt Lake County, and we are on roofs across it regularly enough to know how the housing there was built.

Questions we get asked


Not the question you had? Call the shop and ask a person. We would rather talk it through than have you guess from a website.

(801) 382-8898
Do you actually work in Cottonwood Heights?

We do. Cottonwood Heights falls well inside the radius we run, and being there often is what lets us tell you how the housing around it was built.

How fast can you get to Cottonwood Heights after a storm?

We stop the water first. Temporary work is genuinely temporary and we say so, but it buys the time to do the actual repair right.

How long does a roof replacement take?

Most houses in this valley are a one to two day job once the crew is on site. Steeper pitches, multiple layers to strip and complicated roofs with a lot of valleys take longer, and we tell you which yours is before we start.

Do you handle the insurance side?

On hail-damaged roofs, we work with your insurance to get the roof covered. We document the damage thoroughly with photographs, so the claim reflects what is actually on the roof.

What happens if you find bad decking?

We show you. The decking is only visible during a tear-off, so that is when soft sheathing gets found and replaced. We photograph it rather than just add it to a list.

Where Cottonwood Heights sits on our map


Cottonwood Heights is inside the sixty mile radius we cover around Salt Lake City.

Metal Roofing in Cottonwood Heights


Call (801) 382-8898.