TPO Roofing around Ogden
Heat-welded white membrane for commercial low-slope.
TPO Roofing for Ogden homes and buildings
TPO sheets mechanically fastened or adhered, seams hot-air welded and probed.
A lot of Ogden’s housing stock is brick and craftsman with steeper pitches and real character, and roofs there reward being detailed properly rather than covered quickly. Valleys and chimney flashing are where these houses leak.
A welded seam is a continuous sheet. A taped seam is a future leak.
What matters on TPO roofing
Drainage before material
The first question on any low-slope roof is where the water goes. Ponding is what kills membranes, and a roof that holds water for days after a storm will fail early regardless of which sheet is on it. We look at the slope, the drains and the terminations before we talk about material.
Seams and terminations
Field failures on commercial roofs are rare. Failures at seams, curbs, drains and the parapet edge are common. A hot-air welded seam that has been probed is a continuous sheet. Anything taped or glued and unverified is a scheduled leak.
How the system goes together
Ridge vent against box vents
A continuous ridge slot pulls air along the entire peak, which is why it outperforms a row of box vents on most houses. Box vents still win in specific situations: a hip roof with almost no ridge to cut, a roof broken into separate attic spaces that do not share air, or a low ridge where a slot would sit under drifted snow all winter.
Never mix the two on one attic
Put both on the same space and the ridge pulls its air from the nearest box vent instead of from the soffit. The attic barely moves and the roof looks correctly vented from the driveway.
Fasteners rust from the inside out
Screws and nails on a roof within reach of the lake air corrode faster than the same hardware would inland. A plain steel nail head disappears under a shingle and takes years off the roof’s hold without a single visible symptom. Hot-dipped galvanized or stainless where the metal is exposed is a small line item that decides whether the roof reaches its rated life.
Mixed metals make it worse
Aluminum flashing pinned with the wrong screw sets up a reaction that eats the softer metal at every contact point.
We look at the old nails
What came out of the last roof tells you what to put in the new one.
What we check
- Field condition and granule loss
- Valleys, ridges and every transition
- Penetrations and their flashing
- Gutter and fascia condition
What the job looks like
Get on the roof
We walk it rather than look from the drive, check the decking underfoot, the flashings and the ventilation, and photograph what we find before any number is discussed.
Show you what we saw
The photographs come back to you with a plain read of what the roof needs and, just as often, what it does not need yet.
Crew on site
The crews we hire work under Hancock’s direction, staged so landscaping and the drive are protected, working the detail in the order it is supposed to go on rather than the order that is quickest.
Leave it clean
Site cleared at the end of every day, a magnet run over the whole yard for nails at the finish, and the roof walked with you before we go.
Wet leaves against a wall line
Where a lower roof runs into a two-story wall, leaves and needles collect in that inside corner and stay. The pile holds water directly against the bottom of the siding and the top of the step flashing, which is the one place on a roof where a little standing moisture does the most damage.
Clear the corner, check the kickout
A kickout flashing at the bottom of that run throws the water into the gutter instead of behind the siding. Plenty of houses up here were built without one.
Ice dams start at the eave
The mechanism is simple and it ruins ceilings. Heat escaping the living space warms the deck, snow above melts, the water runs down to the cold overhang past the heated wall line and freezes there. The ridge of ice that builds up backs meltwater under the shingles.
The fix is not a heat cable
Cables buy a season. Sealing the attic bypasses, getting insulation depth right at the top plate, balancing intake and exhaust, and running ice-and-water shield well past the interior wall line is what actually stops it.
Where roofs go wrong
The shortcut we see most
A membrane laid over wet insulation because tearing off would have cost a day. The roof looks finished, the moisture stays underneath, and the sheet fails early from below.
What good looks like instead
Moisture surveyed, wet sections cut out and replaced, drainage corrected, then the membrane installed and its seams probed.
Signs worth a look
- Ponding water still standing two days after rain
- Seams that have lifted or opened at an edge
- Blisters or ridging across the field
- Interior staining near drains, curbs or the parapet
What to expect
Scheduling around your operation
Most commercial work can be staged so the disruptive part happens when the building is quiet. Tear-off noise, crane or hoist time and material deliveries all get planned against your hours rather than ours.
What the roof survey covers
Before specifying anything we survey the existing assembly: slope and drainage, moisture in the insulation, the condition of seams and terminations, and how the roof is being used. A roof somebody walks on weekly needs a different answer from one nobody touches.
Documentation
Commercial and public work runs on records. We photograph the existing condition, the work in progress and the finished assembly, so there is a file rather than a recollection.
Getting to Ogden
Working Ogden regularly rather than occasionally is what makes an honest read possible. We have been on enough roofs across Weber County to know which subdivisions came from the same builder and inherited the same shortcut.
That proximity is most of what matters when weather moves through. Ogden sits in Weber County, and we are on roofs across it regularly enough to know how the housing there was built.
Questions we get asked
Not the question you had? Call the shop and ask a person. We would rather talk it through than have you guess from a website.
(801) 382-8898Do you actually work in Ogden?
Yes. Ogden sits inside the ground we cover around Salt Lake City, and the crew is there most weeks rather than once a season.
How fast can you get to Ogden after a storm?
As fast as we can get there. Stopping the water comes first and the permanent repair follows once the weather opens a window.
How long does a roof replacement take?
Most houses in this valley are a one to two day job once the crew is on site. Steeper pitches, multiple layers to strip and complicated roofs with a lot of valleys take longer, and we tell you which yours is before we start.
Do you handle the insurance side?
On hail-damaged roofs, we work with your insurance to get the roof covered. We document the damage thoroughly with photographs, so the claim reflects what is actually on the roof.
What happens if you find bad decking?
We show you. The decking is only visible during a tear-off, so that is when soft sheathing gets found and replaced. We photograph it rather than just add it to a list.
Where Ogden sits on our map
Ogden work is scheduled like the rest of the valley.